The set-up comes with distinctive infrastructural challenges. For instance, the agency wants to verify to not generate an excessive amount of warmth and make individuals within the constructing uncomfortable, Halliburton mentioned, which is why the miner, fairly paradoxically, needed to additionally set up a dry cooler on prime of the constructing to assist regulate the temperature.